
August 2018 – Beginning Installation of Our Helical Pile Design for an Observation Platform at a Delaware Estuary.
August 2018 – Beginning Installation of Our Helical Pile Design for an Observation Platform at a Delaware Estuary.
A Classic Chester County Bank Barn on a Spectacular Fall Day.
Floor Truss Reinforcement Design. Repaired Floor Truss.
A challenging repair of a large 1950s window lintel, with deteriorated brick support plates. The steel I-beam lintel is completely encapsulated in the exterior masonry wall and the unique exterior brickwork had to be maintained.
Entry Addition to Historic Church
This Historical, Mission-Style Structure is a Unique Sight in this Area but it had been neglected for some time.